Work to be Done

switch hardware upgrade

Delivery of the switch hardware we need was delayed. It is due by noon today, via FedEx.

"Bare Metal" servers

Servers that are not virtualized will be moved this morning while we are installing the new switch hardware. This will impact:

  • nitrc.org
  • the Oracle 3-node RAC system and databases hosted there.
  • the SVN data repository
  • the CVS data repository

    VM migration status

    We are hoping the switches will arrive early enough to allow us to

    Oracle RAC move

    Daniel Wei will be assisting us with the move of this equipment.

    NetApp move

    The NetApp will be one of the last pieces of equipment to be relocated. During this time, all VMs that use shared NetApp storage to facilitate disaster recovery will be suspended. CAMERA Oracle databases will be unavailable. WBC data stored on the NetApp will also be unavailable.

Project Impacts

CAMERA

Oracle databases and Oracle database servers unavailable during NetApp move.

NIF

Work completed

VM migration

Four of our VM hosts have now been moved to the new location and a number of VMs have been migrated to these machines.